Skip to product information
1 from 4
TROY LEE DESIGNS

TROY LEE DESIGNS FLOWLINE SE MIPS MTB Helmet Black/Camo

The TROY LEE DESIGNS FLOWLINE SE MTB Helmet, equipped with Mips® technology and certified for eMTB electric bikes, sets a new benchmark in safety... Read more
Regular price 83,99 €
Regular price Sale price 83,99 €
View full details

Description

The TROY LEE DESIGNS FLOWLINE SE MTB Helmet, equipped with Mips® technology and certified for eMTB electric bikes, sets a new benchmark in safety with a modern and minimalist design, and also benefits from a five-star safety rating awarded by Virginia Tech.

With its 14 ventilation openings, it offers optimal airflow to keep you comfortable on the trails. Its interior features an antimicrobial lining that ensures impeccable hygiene, even during the most intense rides. In addition, the Fidlock® magnetic closure system guarantees practical and quick use.

Perfect for Trail enthusiasts, this robust and high-performing helmet combines protection, comfort and functionality in a clean style.

SIZES HEAD CIRCUMFERENCE
XS/S 53-56 cm
M/L 57-59 cm
XL/XXL 60-63 cm

 

Ref: 9320466121053

Technical information

Weight (Manufacturer): 375g

3-Way adjustable visor without screws (3 positions);
Mips® B-Series, brain protection system against rotational impacts;
360° adjustable retention system with 3-position rear height adjustment;
14 vents for maximum airflow;
Full wrap-around in-mold construction;
MTB Trail helmet;
Fidlock magnetic buckle system;
Dual-density EPS for low and high-speed impacts;
Premium antimicrobial Quick Dry liner;
Lateral strap adjustment;
Certification: CPSC 1203, CE EN 1078, AS NZ 2063:2008*, E-bike certified NTA 8776;

Price information

*Supplier recommended retail price in February 2024